- Home
- Leads by trade
- Access control
Low voltage · updated Oct 21, 2026
Access control leads in new construction
Door readers, keypads, intercoms and gate operators on new apartments, commercial buildings and custom homes. These counties have new projects near the low-voltage prewire, and more of them near the finish.
New construction by county
Questions
When should I bid access control on a new building?
Run the wire at the prewire, while the walls are open. Set the readers, locks and gate operators at the finish, before the final inspection. Build Radar shows the stage of every project, so you can call for both.
How do I find access control jobs in new construction?
Build Radar reads the public building permits and their inspections, and shows the builder and the phone numbers on file. New apartments and commercial buildings show apart from houses. You can start with 3 free projects, with no card.
Where is the most new construction?
Palm Beach County, FL (2,980+ projects), Spokane and Eastern Washington, WA (1,920+ projects) and North Seattle, WA (1,680+ projects). The list on this page shows every county.
Where these numbers come from
Build Radar reads the public permit records of each county and city - the permits, their status and their inspections - and puts every new building on one map. These counts were made on Oct 21, 2026.
Each number is rounded down to the nearest 10, and a number under 10 is not shown. Finished houses, cancelled or expired permits and permits a year old with no recent inspection are not counted. Each dot on the map is moved to its own spot inside a square about 450 m across, so no dot sits on a house.
Inside the app each project shows its build stage, the builder, the plans when the county posts them and the phone numbers on file.
Call while the walls are open.
Start with 3 free projectsNo card. Pick the projects you want and see who to call.